Screed calculator: screed, perimeter edge strip and self-levelling compound
Work out screed: m³, kg and bags (25 or 40 kg) from area and thickness – the result appears instantly, rounded up to whole bags.
In short Example (Living room 5.00 × 4.00 m · CT screed 5 cm · Ready-mixed 25 kg · Self-levelling compound 5 mm): Screed 80 bags, 1.00 m³ screed · 2.00 t. Rule: area × thickness in mm × 2.0 kg/m² per mm (cement screed), divided by the bag size.
An example step by step
Living room 5.00 × 4.00 m · CT screed 5 cm · Ready-mixed 25 kg · Self-levelling compound 5 mm
- 1Volume20.00 m² × 50 mm ÷ 1000 = 1.00 m³
- 2Pre-mixed screed20.00 m² × 50 mm × 2.0 kg/m²/mm = 2,000 kg → 80 bags of 25 kg
- 3Mix on site (approx.)1 : 4 → cement 400 kg (16 bags) + sand 1,600 kg
- 4Edge strip18.00 m × 1.05 = 18.90 m → 1 roll of 25 m (perimeter from the rectangles)
- 5Self-levelling compound20.00 m² × 5 mm × 1.6 kg/m²/mm = 160 kg → 8 bags of 20 kg
- 6Drying (rule of thumb)min(5, 4) + 2 × max(5 − 4, 0) = 6 weeks
- Result: 80 bags
How we calculate
Volume = area × thickness (in m). Ready-mixed = area × thickness in mm × consumption (cement screed 2.0 kg/m² per mm, calcium sulphate 1.9 kg/m² per mm), divided by the bag size and rounded up.
Site-mix (1 : 4): one fifth of the dry weight is cement, four fifths are sand – as an approximate value.
Perimeter edge strip = perimeter × 1.05, rounded up to whole rolls. Self-levelling compound = area × layer thickness in mm × 1.6 kg/m² per mm.
Drying (rule of thumb, cement screed): up to 4 cm one week per cm, above that two weeks per additional cm. A moisture test, not the calendar, always decides when the screed is ready for the floor covering.
Screed per m²: weight and bags by thickness
The amount needed grows with every millimetre of thickness: for cement screed (CT) the calculator uses 2.0 kg per m² per mm, for calcium sulphate flowing screed (CA) 1.9 kg.
| Thickness | Cement screed kg per m² | Bags of 25 kg for 10 m² (CT) | Calcium sulphate kg per m² |
|---|---|---|---|
| 45 mm | 90 | 36 | 85.5 |
| 50 mm | 100 | 40 | 95.0 |
| 60 mm | 120 | 48 | 114.0 |
| 70 mm | 140 | 56 | 133.0 |
Below 45 mm the calculator shows a note for cement screed; minimum thicknesses are set by standards and the manufacturer, and differ with underfloor heating. For 40 kg bags, change the bag weight in the calculator. Guide values, no guarantee.
Screed calculator app
Works out screed, cement and sand, perimeter edge strip and self-levelling compound – rounded up to whole bags. In the browser you calculate one room – in the app whole homes, with a PDF for your customers.
- Projects & rooms
- PDF with logo
- Your own defaults
- Offline, no account
Common questions
How much screed do I need per m²?
That depends on the thickness. For 50 mm of cement screed as a ready mix, it is around 100 kg per m², i.e. four bags of 25 kg. The calculator uses 2.0 kg per m² per mm.
What is the mixing ratio when mixing it yourself?
The usual ratio is cement to sand of 1 : 4 by weight. One fifth is cement, four fifths are sand. The calculator gives this as an approximate value.
How long does screed need to dry?
As a rule of thumb for cement screed: up to 4 cm one week per cm, above that two weeks per additional cm. A moisture test, not the calendar, decides whether you may lay the floor covering.
What is the perimeter edge strip for?
It decouples the screed from the walls and takes up movement. The calculator uses the perimeter plus a 5% allowance and rounds up to whole rolls.
What is the minimum thickness?
Below 45 mm the calculator shows a note for cement screed. Standards and manufacturer’s data take precedence – especially with underfloor heating.
Ready-mixed or mix it yourself?
Ready-mixed saves time and is consistent. Mixing it yourself is cheaper for larger areas. CA screed is only available ready-mixed.
How much screed do I need for 100 m²?
For 50 mm of cement screed (CT) it is 5.0 m³ and 10 t, as a ready mix 400 bags of 25 kg or 250 bags of 40 kg.
How many m² of screed does a 40 kg bag cover?
At 50 mm thickness, cement screed needs 100 kg per m²: a 40 kg bag covers 0.4 m², a 25 kg bag 0.25 m². At 60 mm it is 0.33 m² per 40 kg bag.