In short For 60 mm of cement screed the rule of thumb gives about 8 weeks: 4 weeks for the first 4 cm and two weeks per additional cm. Even so, only a moisture test shows when it is ready for floor covering – Drying time (rule of thumb): 8 weeks. Calculation steps: Volume, 20.00 m² × 60 mm ÷ 1000 = 1.20 m³.

An example step by step

For 60 mm of cement screed the rule of thumb gives about 8 weeks: 4 weeks for the first 4 cm and two weeks per additional cm. Even so, only a moisture test shows when it is ready for floor covering.

  1. 1
    Volume20.00 m² × 60 mm ÷ 1000 = 1.20 m³
  2. 2
    Pre-mixed screed20.00 m² × 60 mm × 2.0 kg/m²/mm = 2,400 kg → 96 bags of 25 kg
  3. 3
    Mix on site (approx.)1 : 4 → cement 480 kg (20 bags) + sand 1,920 kg
  4. 4
    Edge strip18.00 m × 1.05 = 18.90 m → 1 roll of 25 m (perimeter as entered)
  5. 5
    Drying (rule of thumb)min(6, 4) + 2 × max(6 − 4, 0) = 8 weeks
  6. Result: Drying time (rule of thumb): 8 weeks

Cement screed: drying time by thickness

The rule of thumb for cement screed: up to 4 cm one week per cm, above that two weeks per additional cm. The table shows the weeks until the first CM test.

Cement screed (CT): drying time by the rule of thumb in weeks
Screed depthDrying time in weeks (approx.)
30 mm3
40 mm4
50 mm6
60 mm8
70 mm10
80 mm12

This is only a rule of thumb. The CM test, not the calendar, decides whether you may lay the floor covering. Calcium sulphate screed (CA) has no rule of thumb in weeks: only the CM value counts there.

The calculator app

Screed calculator app

Works out screed, cement and sand, perimeter edge strip and self-levelling compound – rounded up to whole bags. In the browser you calculate one room – in the app whole homes, with a PDF for your customers.

  • Projects & rooms
  • PDF with logo
  • Your own defaults
  • Offline, no account
FreeGet the app free · Pro features one-off for £4.99, no subscription
Coming soon on theApp StoreGet it onGoogle Play
The app is free and calculates fully without Pro. Pro unlocks saving, projects and PDF.

Common questions

How long does cement screed need to dry?

As a rule of thumb: up to 4 cm thickness one week per cm, above that two weeks per additional cm. For 40 mm that is 4 weeks, for 50 mm 6 and for 60 mm 8.

Is the screed ready for floor covering after this time?

Not automatically. The rule of thumb is only a guide value. Only a moisture test (calcium carbide method, CM) decides whether the screed is ready for floor covering. Temperature, air humidity and ventilation change the time considerably.

Why does the calculator give no weeks for calcium sulphate screed?

For calcium sulphate flowing screed (CA) there is no reliable rule of thumb in weeks. The calculator shows the CM limit values instead: ready for floor covering at no more than 0.5 CM-% (unheated) or 0.3 CM-% (heated); for comparison, cement screed 2.0 or 1.8 CM-%. Drying and readiness for floor covering depend on the manufacturer’s data and the CM test. Additives and rapid-setting cements also change the times.

What is the CM test?

In the CM test a screed sample is crushed and mixed with calcium carbide in a pressure bottle. The resulting pressure shows the residual moisture content. The value is compared with the limit value for the planned floor covering.

Does the rule of thumb also apply with underfloor heating?

Not without further checks. For heated constructions additional requirements apply, for example for heating up, as well as their own limit values for residual moisture. The information from the screeder and manufacturer is what counts.

Which screed thickness dries in six weeks?

By the rule of thumb for cement screed (1 week per cm up to 4 cm, above that 2 weeks per cm), 5 cm thickness is dry in 6 weeks (4 + 2 × 1 weeks). Only the CM test shows whether you may lay the floor covering.

How long does a 6 cm thick cement screed take to dry?

By the rule of thumb, 8 weeks (4 weeks for the first 4 cm, 2 × 2 weeks for the remaining 2 cm). The CM test remains decisive.